qoc
  • Home
  • about us
  • the Group
  • Mission
  • Products
    • QUICK OPENING CLOSURES WITH TOOTH
    • QUICK OPENING CLOSURE WITH TEETH FOR AUTOCLAVE
    • THREADED QUICK OPENING CLOSURES
    • QUICK OPENING CLOSURES WITH JAWS
    • QUICK OPENING CLOSURES WITH SECTORS
  • Projects
    • 32”/150-12 barg
    • 20”/300 – 30 barg
    • 12”/150 – 16 barg
    • 12”/1500 – 160 barg
    • 16”/150 – 5 barg
    • 34″/600 – 99.9 barg
    • 10”/600 – 85 barg
    • 16”/900 – 120 barg
  • Quality
  • News
  • Contact us
  • English
    • Italian
Select Page
Reducing installation time? Here’s how a custom-designed closure simplifies on-site work

Reducing installation time? Here’s how a custom-designed closure simplifies on-site work

by qoc | Oct 27, 2025 | Uncategorized

Reducing installation time through custom design Reducing installation time is a top priority during the construction of industrial plants, especially in complex environments or when working under tight deadlines. Every day saved on site translates into cost savings,...
Not just Oil & Gas: sectors where a quick opening closure can make a difference

Not just Oil & Gas: sectors where a quick opening closure can make a difference

by qoc | Sep 5, 2025 | Uncategorized

Sectors where a quick opening closure can make a difference in efficiency and safety Quick closures are often associated with the Oil & Gas sector, but in reality, they are used across numerous industrial fields where reliability, sealing performance, and fast...
Quick opening closures and predictive maintenance: how to optimize safety and performance

Quick opening closures and predictive maintenance: how to optimize safety and performance

by qoc | Aug 29, 2025 | Uncategorized

Quick opening closures and predictive maintenance for safer and more reliable plants The integration of quick opening closures and predictive maintenance is a key step in increasing the safety and reliability of industrial plants. In environments where operational...
The diary of a complex commission from technical study to commissioning

The diary of a complex commission from technical study to commissioning

by qoc | Jul 3, 2025 | Uncategorized

Complex commission: when every detail counts Managing a complex commission means facing a technical and organisational challenge in which every phase, from design to commissioning, requires maximum precision and coordination. When working on highly critical systems,...
The return of gas infrastructures in Europe: impacts and opportunities for the quick turnaround sector

The return of gas infrastructures in Europe: impacts and opportunities for the quick turnaround sector

by qoc | Jun 19, 2025 | Uncategorized

Return of gas infrastructure in Europe and industry transformation After years of slowdown, the return of gas infrastructure in Europe marks a change of course in continental energy strategies. Increased demand for energy security has rekindled interest in pipelines,...
Choosing a quick opening closure according to the operating pressure and the fluid handled

Choosing a quick opening closure according to the operating pressure and the fluid handled

by qoc | May 3, 2025 | Uncategorized

Why choosing the right quick opening closure according to operating pressure and fluid processed is essential for every system Choosing the right quick opening closure according to operating pressure and fluid handled is a crucial step in the design of industrial...
« Older Entries
  • 10”/600 – 85 barg
  • 12”/150 – 16 barg
  • 12”/1500 – 160 barg
  • 16”/150 – 5 barg
  • 16”/900 – 120 barg
  • 20”/300 – 30 barg
  • 32”/150-12 barg
  • 34”/300 – 47 barg
  • 34″/600 – 99.9 barg
  • 44”/150 – 19,6 barg
  • Facebook
  • X
  • Instagram
  • RSS

Designed by Elegant Themes | Powered by WordPress